Case Study 8 Loft Conversion

Case Study 8 Loft Conversion

Located in Port Solent, Portsmouth adding two bedrooms and a shower room suite.  Glass gable wall installed to rear elevation.  Velux windows to side elevation.  Dormer window installed in centre of side elevation allowing for staircase and shower room suite installation.  Duration 8 weeks.

Read our clients review on CheckaTrade.  More loft conversion case studies can be seen on our video page.

For Your FREE Feasibility Survey Call 023 9270 6150

For Your FREE Feasibility Survey Call

023 9270 6150